After seeing the new ensuite, I just felt it wasn't right and so in the morning we went over it with our builders again. It took over an hour, we even considered a corner toilet but due to the position of our ensuite we were very limited in our options but we ended up reverting back to the original design almost. We had to move a double socket in the end and come out more. I still would have liked it to be tighter.
It's not so harsh and will catch some of the light from the window. It's not perfect but it was better than the first attempt.
I sorted out the hall way, I didn't understand why we needed 3 switches so we now have 2. There's so many little things you have to consider.
Downstairs is getting insulated and tacked, tomorrow will be the kitchen and a new steel beam...